What Is Integrated Project Delivery?

One of the first steps in a construction project is selecting a project delivery method. Project delivery techniques determine how a construction project is carried out from beginning to end, how contracts are set up, and how team members interact on a daily basis. Project delivery methods can also impact a project’s quality. Design build, design bid build, and integrated projects are common delivery techniques.

Integrated Project Delivery (IPD) overview

Who works on an IPD team?

According to the IPD model, there are many participants who are crucial to the delivery and completion of the three main project areas. The IPD model relies on numerous experts in these three fields, much like the traditional construction triad of a contractor, an architect or designer, and the project owner. The IPD model works well for a variety of construction projects because it incorporates a diverse team, and the following professionals are frequently found on an IPD team:

Project owners

Depending on the kind of building and structure that the design and construction teams work on, a project’s owners can change. Most construction projects have a mix of private, public, and nonprofit owners, such as religious institutions or charitable organizations. The intent and request for building design and construction to provide specifications for design and construction teams are generally created by project owners. In private settings, residential property owners who need the design and construction of homes and other personal structures can also be project owners.

Design teams

The IPD model’s design teams can include a wide range of people with technical, engineering, architectural, and graphic design backgrounds. For instance, architects and structural engineers frequently work together during the initial planning and development stage to produce blueprints and structural designs for project owners to review. Additionally, these experts work together with programmers, graphic designers, and other technical experts to convert two-dimensional project outlines into three-dimensional models and prototypes.

Other design experts may be able to support a project’s outcome, depending on the type of project and overall complexity. Design teams frequently receive assistance from assistants in architecture and engineering, as well as financial consultants, in planning, managing, and budgeting for various projects.

Construction teams

Several participants play crucial roles in supporting outcomes both directly and indirectly during the project construction phase. Senior and leadership teams that oversee construction teams on the job site frequently include contractors, subcontractors, and construction managers. Other essential team members who take on the delegation and direction of crucial project tasks include site engineers, architectural directors, and project managers. Other team members who work directly with materials to build and complete projects include equipment operators, carpenters, drywall technicians, commercial painters, HVAC technicians, inspectors, and other construction workers.

What is the integrated project delivery model?

Throughout the early 2000s, the integrated project delivery model, or IPD for short, emerged as a crucial strategy for concluding construction projects. In order to integrate professionals, business structures, and construction practices into collaborative processes that lead construction projects to successful outcomes, the IPD model approaches risk management and project design. The IPD model integrates teams’ diverse talents, qualifications, knowledge, and skills to maximize work efficiency throughout all phases of a project and optimize construction designs.

Instead of passing these project components between cooperating parties as is the case with traditional project delivery methods, IPD places a strong emphasis on the accountability of the entire project team as well as the management of risk and project design. IPD also mandates the incorporation of a number of important team members to complete construction projects from beginning to end, and it compiles team roles and crucial project information into a multi-party contract that includes the following information:

When to consider IPD for construction projects

Professionals who are considering using the IPD model for their projects frequently do so for specific project types and parameters because the IPD is different from a traditional construction project contract. Several instances to consider using the IPD model include:

There may be other circumstances in which a project would benefit more from an IPD model than from a conventional construction contract. But among these various traits are the criteria that project teams frequently consider when thinking about implementing an IPD contract.

Pros of the integrated project delivery model

When you use this strategy, you can find the following advantages because construction projects need to carefully fit the criteria for applying the IPD model:

Cons of the integrated project delivery model

Depending on the type of project you’re considering, there may be a number of disadvantages to using an IPD model even with all of its benefits. Some of these challenges to the IPD process include:

Team members who use this project model can frequently mitigate or completely avoid these challenges, even though the IPD model can occasionally exhibit some of them. For instance, managers and directors can help new team members by providing adequate IPD training and skill-building when creating crucial teams. Making all documentation, project specifications, and crucial data available to all participants who support project development and completion is another way project owners, design teams, and construction teams can lessen the challenges of IPD methodology. Project teams can ensure the success of the projects they work on in these ways.

FAQ

What is an integrated approach to project delivery?

IPD is an approach to project delivery that combines people, systems, business structures, and practices into a procedure that cooperatively taps the skills and insights of all participants in order to maximize efficiency, improve value to the owner, and optimize project results.

Is integrated project delivery the same as design-build?

The contractual arrangement is the primary distinction between IPD and the Design-Build approach. In a design-build project, the owner and the design build entity create a single contract. Owner, architect, and general contractor stakeholders all enter into a single agreement for IPD.

What is an integrated project?

Integrated Project, a degree-granting project that resembles a thesis but is typically interdisciplinary Integrated Project Delivery, a business project delivery method. Integrated Project Support Environment is a collection of technical and management tools for software development.